SOME OF OUR WORKS

CONSULTING

Triangle logo white black background.JPG
ponte Piraju.jpg

PROJECT VERIFICATION

Triangle logo white black background.JPG
PUC NRCP.JPG
Portifólio: Projetos

PROJECT VERIFICATION

Rio Office Tower (2008)

Rio de Janeiro

Photo Rio Office Tower f

Client: RENTA Engenharia


Building with three basements and 15 floors. Reinforced concrete structure with prestressed floors.

Hospital Unimed - Barra da Tijuca (2008)

Rio de Janeiro

Unimed hospital electronic model

Client: SIG Empreendimentos Imobiliários

Building with a basement, three standard floors, a technical floor and a roof. Reinforced concrete structure.

The Park Building, Águas Claras (2011)

Brasilia

Client: SIG Empreendimentos Imobiliários


Reinforced concrete structure with prestressed floors.

Windsor Hotel (2012)

Rio de Janeiro

Electronic model of the Windsor-Barra hotel

Client: SIG Empreendimentos Imobiliários


Building with three basements, a ground floor, a patio, 15 standard floors, a roof and a technical floor. Reinforced concrete structure.

Total built area of 36100 m².

Sofiscato (2013)

Rio de Janeiro

Client: Calper

Four blocks with a basement, three type floors and roof.
Total built area of 15600 m².

Heritage Design Hotel (2013)

Rio de Janeiro

Electronic model of the Calper building

Client: Calper

Building with two basements and nine floors. Reinforced concrete structure.
Total built area of 16700 m².

Choice Recreio Residence Building (2013)

Rio de Janeiro

Client: Calçada SA


Two towers with 26 floors, reinforced concrete structure, total construction area of 46500 m²

PortoVida Residence (2013)

Rio de Janeiro

Electronic model of the PortoVida building

Client: Consórcio Porto 2016


Eight blocks with up to 35 floors. Reinforced concrete structure with prestressed floors.
Total built area of 127000m².

Liege Building (2014)

João Pessoa

Client: GBM Engenharia

Building with 54 floors; ratio between height and smallest dimension in plant equal to 10.7. Reinforced concrete structure with fck concrete up to 85 MPa.

Refinatto Club (2014)

Rio de Janeiro

Electronic model of the Refinatto building

Client: MontSerrat Construção and Incorporação

Four blocks with up to 16 floors. Reinforced concrete structure.
Total built area of 48600 m².

Shopping Estação Cuiabá (2015)

Rio de Janeiro

Electronic model of the Cuiabá Station Shopping Mall

Client: BRMalls

 

Reinforced concrete structure with a total built area of 131000m².

Quattro Building (2016)

Rio de Janeiro

Electronic model of the Quattro building

Client: W3 Engenharia

 

Building with a basement and ten floors. Reinforced concrete structure.

Shopping Vila Velha (2018/2019)

Vila Velha

images (1).jpg

Client: Littig Engenharia

Verification of reinforced concrete structures. Reinforced concrete structure with prestressed floors.

Total built area of 230,000 m².

Regional Nucleus of Competence in Petroleum (2019)

Rio de Janeiro

Photo of the Regional Oil Competence Center building

Client: Instituto Tecgraf - PUC-Rio

Verification of reinforced concrete structures.

Total built area of 10,000 m².

Norte Shopping Expansion (2019)

Rio de Janeiro

Client: BRMalls

 

Verification of the metallic structure of the expansion project.

Shopping Estação Cuiabá (2017)

Rio de Janeiro

Electronic model of the Cuiabá Station Shopping Mall

Client: BRMalls

 

Verification of the metallic structure of the cinema (area 120m x 24m and height 16m), domus, facades and marquees.

Terrazas Conde de Bonfim (2020)

Rio de Janeiro

Client: W3 Engenharia

Verification of reinforced concrete structures. Reinforced concrete structure with prestressed floors.

Total built area of 230,000 m².

Residential Building – R. Codajás (2020)

Rio de Janeiro

Client: Stewart Engenharia e Participações Ltda.


Residential building with three floors.
Reinforced concrete structure. Approx. built area: 4,700 m².

Residential Building – R. Heitor Doyle Maia (2020)

Rio de Janeiro

Model.png

Client: Stewart Engenharia e Participações Ltda.

 

Main building with a basement and four floors, and an annex building with two floors and a machine room.
Mixed structure (reinforced concrete and steel).

Residential building R. Caio de Melo Franco (2020)

Rio de Janeiro

Client: LAER

 

Residential building with four floors.
Steel structure with steel deck slabs and reinforced concrete foundation blocks and ties. Approx. built area: 1,320 m².

 Villa Visconti Building (2021)

Rio de Janeiro

Villa Visconti Building

Client: W3 Engenharia


Reinforced concrete building comprising a ground floor, one common use floor, five standard floors, rooftop, and roof. Total built area: 4,180 m².

Residential building – R. Dulcídio Cardoso (2022) 

Rio de Janeiro

Client: LAER


Reinforced concrete structure with a basement, ground floor, one upper floor, and roof. Approx. built area: 2,100 m².

Beit Yacoov School (2022)

São Paulo

Client: It's Informov

 

Educational complex composed of a main building with a basement and four floors, and an annex with two floors and a machine room. Mixed structure combining reinforced concrete and structural steel.

Cores do Rio (2022)

Rio de Janeiro

Client: W3 Engenharia

 

Building with a ground floor, six typical floors, and a rooftop. The structure is made of reinforced concrete. Total built area: 5,276 m².

Residential Building – R. Irineu Inglês (2022)

Rio de Janeiro

Client: LAER


The residential building has a ground floor, 1st, 2nd, and 3rd floors, and a rooftop. The structure is made of reinforced concrete. Approximate area: 3,600 m².

Residential Building – C. Porto Galo (2023)

Rio de Janeiro

Client: LAER


Building with a ground floor, one upper floor, and a rooftop. The structure will be made of reinforced concrete. Approximate area: 2,190 m².

Residential Building – R. Presciliano da Silva (2023)

Rio de Janeiro

Client: LAER

 

Building with five floors and a rooftop. The structure will be made of reinforced concrete. Approximate area: 4,600 m².

Memorial do Rio Vertical Cemetery Building (2023)

Rio de Janeiro

Facade of the building of the Rio Memorial Cemetery

Client: BRMalls

 

Building with a ground floor, four upper floors, and a rooftop.
The structure is made of reinforced concrete. Approximate area: 15,800 m²

Corporate Office - Bracell (2024)

Lençois Paulista

Client: It's Informov

 

Building with one ground floor, one mezzanine level, four upper floors, and a rooftop. The structure is made of reinforced and prestressed concrete. The total built area is approximately 12,000 m²

Cores de Fátima (2024)

Rio de Janeiro

Client: W3 Engenharia


Reinforced concrete building featuring a ground floor, one garage level, eight upper stories, roof, and rooftop structure. The total built area is 4,708 m².

Jardim da Barra (2024)

Rio de Janeiro

Client: MontSerrat

 

The project comprises two towers, each featuring a ground floor, fourteen upper stories, a rooftop level, machine room, and water tank. The combined built area of both towers is 25,260 m².

Cores da Tijuca (2024)

Rio de Janeiro

Colors of Tijuca 2.jpg

Client: W3 Engenharia

Building with a ground floor, nine upper floors, a rooftop, and a roof structure. The building has a reinforced concrete structure and a total built area of 6,889 m².

Portifólio: Projetos

CONSULTING

Bridge over the Paranapanema HPP  - Pirajú / SP

Technical report on the structural safety of the bridge over the dam of the Paranapanema HPP, located in the municipality of Pirajú / SP.

 

Technical report prepared based on an analysis of the existing structure, with the objective of verifying the bridge's carrying capacity, in order to comply with Brazilian legislation and technical standards.

 

Client: CESI do Brasil Consultoria Ltda.

September / October 2019.

Nuclear Power Plant of Angra III - Angra dos Reis / RJ

Audit of the Angra III Nuclear Plant structural project with special focus on the documentation of the quality assurance of the work, verifying the obligations and technical risks of Andrade Gutierrez for the execution of the contract, based on the project and the technical specifications.

Concrete volume of the work: 195000 m².

 

Services performed in partnership with ICOPLAN - Internacional de Consultoria e Planejamento S/A.

 

Client: Andrade Gutierrez.
July 2018 to February 2019.

Test of tubes at non-uniform external pressure

Tests performed in a hydrostatic camera, with measurement of specific deformations in the tube wall.

The device designed for the test was patented by the professionals involved in the project.

 

Client: Padre Leonel Franca Foundation / Petrobras

2014.

NUCLEP maritime terminal pier - Itajaí / RJ

Verification of the structural design of the NUCLEP maritime terminal pier and execution of a load test, simulating the transport of a 927 tf cargo.

 

Client: PMMR Consultoria e Projetos de Engenharia Ltda./EBSE Engenharia e Soluções
2011

Anchored concrete retaining wall located at BR040 - Petrópolis / RJ

Tensile tests performed on 71 tendons of an anchored concrete retaining wall located on BR040.

Type A and type B receiving tests were performed.

Client: Padre Leonel Franca Foundation / CONCER

April to June 2019

Data collection and structural integrity verification of Bridge 1 at the Coca-Cola Andina factory - Duque de Caxias / RJ

Data collection ( as-built ), verification of structural integrity and verification of the load capacity of Bridge 1 located on the premises of Coca-Cola Andina in Duque de Caxias - RJ.

Client: Coca-Cola Andina
April 2016

Anchored concrete retaining wall located at BR040 - Petrópolis / RJ

Tensile tests performed on 71 tendons of an anchored concrete retaining wall located on BR040.

Type A and type B receiving tests were performed.

Client: Padre Leonel Franca Foundation / CONCER

April to June 2019

Equipment structure.jpg

Data collection and structural integrity verification of Bridge 1 at the Coca-Cola Andina factory - Duque de Caxias / RJ

Data collection ( as-built ), verification of structural integrity and verification of the load capacity of Bridge 1 located on the premises of Coca-Cola Andina in Duque de Caxias - RJ.

Client: Coca-Cola Andina
April 2016